November 9, 2003 . . .
Framing Begins . . . Two Great Frames
November 10, 2003 . . .
Framing of the basement continues
November 12, 2003 . . .
The Bay Wall of the Basement is propped up.
The floor of the main level is framed.
The main level Bay Wall is begun.
At the end of the day, the garage-side
wall awaits tomorrow to be raised.
November 13, 2003 . . .
The main floor is beginning to take shape.  The left side, here, is the front of the house and the right side is the Bay Side.
Inside the house, walls and doorways are going in.
The view through the Master Bedroom window.
At the end of the workday, sunset through the Living Room window.
November 14, 2003 . . .
Pouring the garage retaining wall.
November 16, 2003 . . .
At the two-month mark, a lot has been accomplished, but, it's clear, we have a long way to go.
On a sunny, late-fall day, nearly bare trees reveal our house, on its hill, half completed.  The next couple of months should be just about as exciting as the last.
November 20, 2003 . . .
With the roof on, it's beginning to look like a house.
The garage floor is poured.
November 21, 2003 . . .
Windows and doors make a big difference.
Through the bay-side door to the deck.
The Master Bedroom French Doors lead to the future screened-in porch.
The view through the Master Bedroom windows.
November 24, 2003 . . .
A rainy day can sure bring winter on in a hurry !
No construction today ..
shouldn't have left that window open !
December 1, 2003 . . .
The main deck is added . . .
. . . as is the garage.